Allegheny Ridge Wind Farm
Cambria and Blair Counties, Pennsylvania
Leeward Renewable Energy’s (LRE) Allegheny Ridge project is situated on 5,000 acres near Portage, Pennsylvania, and reached commercial operation in 2007. With a nameplate capacity of 80 MW, the project is comprised of 40 Gamesa G87 2.0 MW wind turbine generators, and interconnects to Pennsylvania Electric Company’s transmission system in PJM. The output from the Allegheny Ridge project is sold into the PJM market.
0 MW
Renewable Energy Capacity
0
COD
0 Gamesa
Wind Turbine Technology
Contact us
If you have additional questions about Allegheny Ridge Wind Farm, please fill out the form
"*" indicates required fields